The Comptroller’s Office ordered ICE and Jasec to annul a hydroelectric contract from 2011 worth millions. The plant was inaugurated in 2013. It had a cost of $188 million. Without…
green energy
-
-
Costa Rica aims to have net zero carbon emissions by 2050 and if it’s energy production in 2019 is a sign of things to come, then it is well on…
-
Costa Rica NewsUncategorized
Wind River Expands Global Presence with Costa Rica Operations
by admin 2019/05/30Wind River®, a leader in delivering software to critical infrastructure, announced it has expanded its global presence with operations and an established site in Costa Rica. The company’s new San…
-
Costa Rica NewsUncategorized
Costa Rica Launches ‘Unprecedented’ Push for Zero Emissions by 2050
by admin 2019/02/26Remember when this was supposed to happen in 2021 in Costa Rica. Although I admire the thought and plan, I have my serious doubts this will happen in Costa Rica.…
-
Costa Rica NewsUncategorized
Costa Rica’s Wind Energy Capacity Climbs to 407.8 MW
by admin 2019/01/21Costa Rican power utility Instituto Costarricense de Electricidad (ICE) said Wednesday that the country’s national electric system has reached 407.77 MW of installed wind capacity, working its way up from…
-
Costa Rica NewsUncategorized
New CEO of ICE in Costa Rica Committed to Geothermal Energy
by admin 2018/05/24Costa Rica News – Earlier this month, Irene Cañas Díaz, civil engineer with a background in renewable energy and urban electric transport, arrived in her new role as CEO of the…
-
Costa Rica NewsUncategorized
Repairs to Costa Rica’s Reventazón Hydroelectric Plant Under Review
by Isabella Foster Villanueva 2018/05/20Costa Rica News – Aresep is investigating the advances at the Reventazón hydroelectric plant.
-
Costa Rica NewsUncategorized
54 days Into 2018 & Costa Rica Has Used a Years Worth of Fuel-Based Energy
by Isabella Foster Villanueva 2018/05/08Costa Rica News -In 54 days, Costa Rica has spent all the fuel-based energy that was planned for use for the whole year.